AgReserves
Project Description
Client: AgReserves
Facility Type: Process Water Treatment Facility
Location: Plymouth, Washington
Project Facts:
- 3.5 Miles of 16” HDPE raw water line from the Columbia River providing raw processing and fire water for the campus
- (2) 75hp Centrifugal pumps in duplex configuration to 60k gallon expandable buffer tank
- (2) 30hp duplex distribution pumps provide 60 psi to users through +/- 1 mi of 10” HDPE pipeline
- Fully PLC automated and user controlled via HMI
