Fisher’s Civil Crew Keeps the Project Moving

Fisher’s civil construction crew makes it easier to respond to the unexpected issues that invariably arise when you dig: bedrock, underground rivers, hidden debris—all can derail a project schedule. The team’s experience makes it possible to respond quickly and with flexibility, so the project can move forward, keeping you on schedule and in budget.

Fisher’s Civil Team is Experienced in:

■ Preload
■ Soil treatment
■ Footing excavation and slab prep
■ Installing dry utilities
■ Sewer and storm lines
■ Water lines
■ Lift stations for storm and sewer
■ Under and above ground detention
■ Erosion control
■ Demolition: picking and crushing
■ Prep for paving: curb, gutter, sidewalks
■ Retaining walls

As a new project manager, each and every aspect of this project was made easier by their patience. They all took a personal interest in making the project successful… Any design oversights were quickly identified and presented for possible correction. Their ability to interpret the plans was exceptional.

Fisher crews performed civil construction including site improvements and utility placement on these projects: 

Henningsen NORPAC, Salem, OR

Lamb Weston, Boardman, OR >

FedEx, Burlington, WA

Silver Bay Seafoods, Valdez, AK >

Lamb Weston Line 5 Addition, Richland, WA >

NewCold, Tacoma, WA

Paine Field Passenger Terminal, Everett, WA